56% completion rate! All arranged by Val today!

1. Install aircon - DONE
2. Fix defective water pipe that have been flooding the front door - DONE
3. Install mirror-cabinet in the bathroom - DONE
4. Bring up bed and Val's cabinet in our bedroom - DONE, except for the cabinet
5. Install shower with heater in the bathroom - DONE

Now the ball is on me. And I'm saying, it can never be done 100%! well, errr, at least not anytime soon. Remember my blog "Lazy or Tired?", haven't figured still.

6. Clean - up cabinets
7. Sort Neo's old clothes and toys
8. Re- start scrap booking
9. Bring to Cavite the little tikes slide given by my boss. Hindi kasya dito sa Kapitolyo